How we got here
Steel Master started in 2009, in the middle of the recession, doing one thing. Metal. Roofing and siding, and nothing else. Not shingles when the metal work is slow, not gutters as a sideline.
Somewhere along the way we got tired of waiting on panel deliveries and bought our own roll former. That turned out to be the decision that changed the business. Now panels get cut to the roof instead of to a truck bed, and a 34 foot run is a 34 foot panel with no lap seam halfway up.
What you get that you would not get elsewhere
- Our own crews, not subcontractors we met last month
- Panels fabricated in Goshen, cut to your roof
- A 40 year paint manufacturer warranty, plus a 10 year workmanship warranty that we personally cover
- A map of every roof we have finished, so you can go stand in front of one
The numbers
- Established2009
- Roofs installed2,800+
- Google rating4.9 stars, 235 reviews
- Facebook97 reviews, 98% recommend
- Workmanship warranty10 years, we cover it
- Paint warranty40 years, manufacturer
- Starting priceMasterrib exposed fastener: $4.50 / sq ft installed
- Energy StarRated
Energy Star rated
Our steel roofing is Energy Star rated. The reflective Sherwin-Williams Weather XL finish, standard on our panels, and the Kynar 500 finish available with the 24-gauge upgrade both push summer heat back off the roof instead of into the attic, which shows up on the cooling bill rather than in a brochure.
Where every panel gets made.
We roll every Masterlok and Masterrib panel we install on our own shop floor at 66607 US 33 in Goshen. Every panel is cut to your roof, not to a truck.